Le Havre (76)
Creation of a flagship building at the port entrance.
- Offices
- Control room
- Pilot boats quay
Owner: Pilotage de la Seine
Budget: €3m
Assignment: Design and architectural compliance
Floor area: 1,000 m²
Partner: Artelia Le Havre
Year: 2022