Saint Caradec (22)
On a steeply sloping site close to a wind turbine, ID Logistics wished to develop a warehouse project with a view to centralising all the storage activities of the Leroy Merlin group in Brittany. This 50,000 m² facility, fitted with cladding sheets supplied by a local company less than 1 km away, follows the complex lie of the land as closely as possible and respects the area around the wind turbine in which all construction is prohibited. The offices are finished with rust-effect cladding and the top floor features an attractive terrace sheltered by a pergola.
Owner: FINANCIERE ID
Works budget: €40m
Assignments: Complete design services and construction supervision
Surface area: 50,000 m²
Partners: JBD (Owner’s consultant)
INGEA (hazardous installation design office)
ARTELIA (technical design office)
Year: mid 2024