Beauvais (60)
Creation of a new 1,300 m² arrivals hall.
The architectural design consisted in developing and extending the T1 terminal on either side of the existing building.
Flow patterns were redesigned in order to help users move more smoothly through the terminal. The façades were cladded with wooden panels protected by wide canopies, forming a sheltered walkway for passengers.
Owner: SMABT / VINCI
Partner: Artelia
Assignment: Feasibility study
Works budget: Undisclosed